Charity seeks contractor to paint Victorian structure in central London.
Renovating a rail bridge that outlasted seven monarchs.
Share your story to mark a quarter century anniversary.
Engineers return to Kessock Bridge for steelwork modification project.
August work date for Orwell joint replacement.
Footbridge closed since 2021 will be replaced with accessible crossing.
Council steps in after bridge owner objects to maintenance obligation.
Footbridge installed in two parts to give step-free access in historic railway station.
Busy Edinburgh road bridge closed suddenly following assessment.
Funding for engineers seeking inspection accreditation.
Elastomeric bearings replaced to increase bridge’s safety and lifespan.
UK contractor puts finishing touches to over-rail bridge with two nature corridors.
Refurb for pedestrian bridge over the Thames in London.
Remote monitoring deployed in battle against vehicle strikes.
New waste-to-energy facility called for upgrade to 1960s structure.
UK road body announces shortlist for low-carbon footbridge contest.
Bridge with a 90-degree turn opens to active travellers.
UK welding issues worsened by testing regime, says HS2 fabricator Severfield
168 wire rope hangers replaced on Menai Bridge.
1830s overbridge will be raised as part of Transpennine improvements.
Accelerate and augment your bridge inspections with digital twins Picture is attached... if you prefer an exact size, please let me know. It's mostly been used quite cropped - especially to lose all the sky!